The Project
True provided structural and civil engineering, surveying, and environmental review and permitting services for the replacement of the Crowninshield Pier and the Cressy Pier, and the rehabilitation of southern sections of the seawall. True completed the structural design, site survey, hazardous materials review, utilities design and evaluation of the subsurface soil conditions, prepared permit applications and submitted to regulatory agencies, prepared State Environmental Quality Review (SEQR) documentation and conducted SHPO Section 106 Consultation. In addition, True prepared an Environmental Assessment (EA) pursuant to the National Environmental Policy Act (NEPA) guidelines.
Services
- Land Surveying
- Civil Engineering
- Structural Engineering
- Environmental Review & Permitting
On Site at the Merchant Marine Academy
Global Issues, Results
Driven Approach
Making sustainable development a reality for people, the planet, and economic progress. We let our portfolio speak for us.