Yukon Territory, Canada

Minto Mine

  • Water Treatment
  • Environmental Planning & Permitting
  • 2015 – 2020

Our Goal

The site owner wanted a passive closure solution for the site, which would require minimal management and achieve long‐term environmental stability. True Environmental was retained to conduct an assessment to inform the design of passive treatment technologies for site runoff water in the post-closure period for the Mine.

Our Gameplan

True Environmental successfully designed and tested a constructed wetland treatment system (CWTS) to remove cadmium, copper, molybdenum, selenium, and zinc during the remediation of site runoff water in the post-closure period for the Mine. Off-site pilot systems provided the data needed for full-scale wetland design and sizing and confirmed treatment rates and performance of several design options. After commissioning, the on-site demonstration-scale CWTS is consistently reducing Se to <0.001 mg/L and Cd to non-detectable levels.

Services

  • Water Treatment
  • Environmental Planning & Permitting
  • Treatment Wetlands
  • Constructed Wetlands
  • Passive System
  • Pilot Testing
  • Environmental Monitoring
  • Process Engineering

Our Team on Site

team members bending down on grassy watery area on project site

The Project Site

areal view of minto mine land structures

Global Issues, Results
Driven Approach

Let’s Create a Better Tomorrow Together